PROVEN EXPERTISE IN HAULAGE AND PORTABLE BUILDING TRANSPORT 

At A Rhodes Haulage, we take pride in delivering reliable, efficient, and tailored transport solutions for every project. Our case studies showcase the challenges we’ve overcome, the innovative methods we’ve employed, and the exceptional results we’ve achieved for clients across the UK. From transporting oversized modular buildings to managing complex site installations, each project highlights our commitment to precision, safety, and customer satisfaction. 
 
Explore our case studies to see how we’ve supported businesses like yours with expert haulage services. 

CASE STUDY  Delivering a Portable Building to Rainbow Childcare, Ossett 

When Rainbow Childcare in Ossett, Wakefield, needed a new modular building for their growing nursery, they required a transport and installation solution that was both efficient and precise. Using our specialist lorry-mounted crane, we delivered and positioned the unit safely within the tight access points of the school grounds. 
 
Our experienced team handled the entire process, from initial planning and site survey to the final placement, ensuring minimal disruption to staff and children. Thanks to our industry-leading equipment and expertise, the project was completed on time, providing the school with a secure and functional new space for their childcare facilities. 

CASE STUDY Delivering a Portakabin Sports Changing Room to an Oxfordshire Sports Club 

When a sports club in Oxfordshire required the delivery of a 15.4m x 4.3m, 10-tonne Portakabin sports and changing facility, careful planning and specialist equipment were essential. Due to the narrow and challenging access roads leading to the site, our team coordinated the transport using two wide-load escort vans and a fully hydraulic steered 13.6m trailer, ensuring a smooth and compliant journey. 
 
On arrival, our 115-tonne metre hiab was set up alongside the site to lift and precisely position the unit onto its pre-cast foundations. Thanks to our expert operators and advanced lifting technology, the installation was completed efficiently, providing the club with a high-quality facility for players and teams. This project showcased our ability to handle large modular buildings with precision, even in logistically challenging locations.